Architectural Tension Bar For Construction High Strength Steel Tie Rod are steel structural members made of carbon structural steel and alloy steel, processed by machining, heat treatment and surface anti-corrosion treatment, supplemented by adjusting sleeves, lock and joints etc. The steel tie rod are important components of steel structures for construction of giant, large span buildings and ship docks. They are mainly used for prestressed parts and large span buildings in construction projects. While the strength of the product is improved, but the plasticity index is not reduced, which satisfies the principle of using the same amount of strength in the architectural design. The tie rods, tie bars, tension rods and tension bars steel grades are specified as grade 460, grade 520, grade 550, grade 650. Tension Bar,High Tensile Steel Rod,Structural Tension Rods,Architectural Tension Bar For Construction SHANDONG LE REN SPECIAL STEEL CO., LTD. , https://www.sdcolddrawnsteelbar.com
umbrella table &Chair Mold REMO type
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Name
Description
Â
Â
Products' infomation we need to make quotation
Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Â
Â
Mould Material
45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc
Â
Â
Mould Base
LKM, HASCO ect.
Â
Â
Cavity
Single/multi
Â
Â
Runner
Hot/cold
Â
Â
Mould Design
3D/2D Drawing
Â
Â
Design Days
3 days
Â
Â
Design Software
UG, PROE, CAD, CAE, CAM, CAXA ect
Â
Â
Plastic Material
PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Â
Â
Mould Life
300, 000-3, 000, 000 shots
Â
Â
Injection System
Pin-point-gate
Â
Â
Polish System
Mirror Polish
Â
Â
Payment
40% of Deposit by T/T, 60% of Balance by T/T
Â
Â
Delivery Time
15-60days
Â
Â
Specification
Depends on customers requirements
Â
 Business Step
1. R& D
We support customer R& D. Make the files or improve the design if you needed
↓ ↓ ↓
2. Quotation Making
Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation
The quality, price, material, delivery time. payment item. ect
↓ ↓ ↓
4. Mould Design
3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould
According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days
↓ ↓ ↓
6. Mould Testing
When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot
If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory
 ↓ ↓ ↓
8. Delivery
Delivery goods by sea or by air, according customers requirement
Umbrella Table &Chair Mold Remo Type Design
Model NO.: REMO-Chair 05
Runner: Hot Runner
Design Software: UG
Installation: Semi Fixed
Standard: DME
Customized: Customized
Mold Steel: P20,718,S136,etc
Mold Base: Lkm,Hasco,Self-Made,etc
Trademark: REMO
Specification: international
Origin: China
HS Code: 8480719090
Plastic Chair Mould