PU Sandwich Panel Roll Forming Machine for External Wall

Model NO.: SH-SD
Name: PU Sandwich Panel Production Line
Panel Material: Aluminum, Galvanized Steel Sheet
Panel Thickness: 50--150mm
Effective Width: 950/1150mm
Length: Less Than 12m
Forming Speed: 8m/Min
Core Density: 40-42 Kg/M2
Thermal Conductivity: 0.018 -0.02 W/Mk
Power Supply: 380V, 50Hz, 3phase
Control System: PLC with Touch Screen
Trademark: Suhang
Transport Package: Standard Package with Film, Plastic and Steel Wire
Specification: 8750x1500x 1200(mm)
Origin: China(Mainland)
HS Code: 8455229090
PU Sandwich Panels for Exterior Wall (Aluminium)
 
  1. Primary technology parameters product line: 
  1. PU foam thickness: 16mm
  2. Linear Speed of production: 5-10m/min
  3. Maximum Roller Forming speed:15 m/min
  4. Reciprocating times of injection head per minute <60
  5. Production type: totally continuous production with PLC controlling
  6. Composite structure:position fixed by double rubber tracker
  7. Foaming system: totally automatically continuous foaming, quantity of foaming could be stepless adjustable
  8. Main Power of production 65KW
  9. Cutting: pneumatic piston driving, non-stop cutting via sliding table
  10. Electronic controlling system: full-frequency PLC controlling system.
 
Roll Forming machine 
   Each Roller forming machine consists of the decoiler, main roller forming machine is equipped outside of the line, which is used to form on the coil of color steel of max500mm in width and 0.35~0.75mm in thickness while exerting certain pressing force.
A. De-coiler ---1 set
  1. Dimensions: 500mm*1000mm*800mm
  2. Width of feeding:max500mm
  3. Maximum loading coil weight :max3000kg
  4. Inter diameter: 460-560mm
  5. Mode of expand &fight: inner expand &fight by manual
  6. Way of feeding: manual
 
B. Main Roll Forming Machine----
1: Coil width: max 500mm   effective width: 360 and 200mm
2: working speed: 12-15m/min
3: roll station: max 21 stations
4: material of roller: grade 45 steel, polished and coated with chrome
5:material of main shaft:45forge steel   diameter roller: Ф60mm
6: main power: max 7.5KW   
7: forming thickness: 0.4mm-0.8mm , zinc and color steel, G250Mpa
8: Transmission: by single Chains 1.2inch
9: feeding and guide: surface polished and coated with chrome
10: machine drive parts adopt protect cover
11: machine adopt new station with chrome
12: size of main machine: Approx.8750x1500x 1200(mm)   L x W x H
13: weight: about max 4000Kgs
14: color of machine: blue (also can choose by customer request)
15: machine should be with four legs (made from metal) in 350mm
  1. One Set of PU Foaming Machine
    One set of PU two component Liquid mixing and injecting section for foaming : it adopt high pressure pump. It have the temperature control system and material-level monitoring system. The tank of the material is about 300L./Two tanks. Injecting proportion is A:B=1:125(A :black  B:white ).
  1. Low pressure P.U. foam dispensing machine complete with: VOLTAGE:THREE PHASE , 380V, 50HZ
  2. 2 set of pumps mounted with separate motors
  3. 1 set of Touch Screen Operator Panel with synoptic graphics and alarm messages and 1 set of PLC
  4. 2 set of flow transducers
  5. 2 set of 300 liter pressurized carbon steel Jacketed tank
  6. 1 set of Temperature control system for each tank
  7. 1 set of 2 component Mixing head:the mixing head speed can be adjusted steplessly .
  8. Injection section: it also can adjusted toward left, right, front or back. There's rail for all the movement.
  9. PU Conveyor machine
  10.   The PU sandwich panel is be conveyed by double aluminium block.
  11.    The length of the BELT machine is about 24m, which consists of upper frame and lower frame, each frame has two sections.
  12.    The width of rubber board is 1mm, the range of adjusting distance between upper and lower rubber board: 300-500mm.
  1. Panel automatically cutting system
  1. Cutting adopts tracking cutting.
  2. Band saw (or fly saw) of the cutting machine can move transversely 1000mm, Cutting machine moves longitudinally and transversely along the slide way.
  3. Cutting machine adopts one-side blade band saw manner, cutting and revolving after cutting. The cutting saw can revolve, so cutting in two directions is realizable.
  4. There is panel tight-pressing system (pneumatic) in the cutting machine;
  5. There is location limiter to limit longitudinal and transverse motion of cutting machine.
TRANSPORTATION
All goods will be shipped to your country, containers number will be decided with how many machines would you choose
Installation of the machine
    The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
-   Installation by Suhang service technicians.
    -   The following services are included:
    -   Installation of the machine components.
    -   Adjustment of the machine components.
    -   Connection of all motors to the control cabinet.
    -   Installation of the required safety devices.
    Delivery extent does not comprise of:
    -  Media supply (electrics, etc.)to the machine(control cabinet)
    -  Raw material process material
    -  Raw material for test
    -  Transport and lifting devices
-  Auxiliary staff.
    The operators of the plant should be present during the installation in order to become familiar with the new machines.
Commissioning of the machine
    The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
    The commissioning comprises:
    -  Commissioning by Suhang service technicians
    -  Training at the machine
    -  The following services are rendered
    -  Run up of the machine components
    -  Testing of all functions of the machine components
    -  Start of a fully automatic molding process
    -  Execution of machine acceptance
    Delivery extent does not comprise of:
    -  Raw materials, process materials and consumables
    -  Raw material for test
    -  Transport and lifting devices
    The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
Our After-Sales Service Commitments
    Suhang hereby solemnly promises: We implement the "three guarantees" service policy for any equipments sold by Suhang, provide free of charge installation guidelines, commissioning and maintenance of the equipments, training of the Buyer's relevant Operators; and provide technical requirements for the installation and operation of the equipments, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts
The detailed measures are as follows:
1.Guidelines for installation and commissioning of equipments:
Based on the actual situation, to assist and guide the Buyer and Buyer's technical personnel in the overall installation location, the installation of equipments, and provide Buyer with answers to their questions and related issues;
 
2.Provide training for operation and maintenance personnel:
Based on the Buyer's request, Suhang will provide free of charge training of the operation and maintenance personnel;
a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;
b) When Suhang is doing the installation and test running of the equipments for the Buyer, the Buyer can send their personnel to participate.
 
3.If failure occurs in any of the machines during the "three guarantees" period(one year), three guarantees including the electricity parts, the rolls, the shafts and punching& cutting moulds, then, upon the Buyer's request, Suhang will eliminate the failure;
 
4. Suhang will inform all its Buyers about any upgrades and significant product improvements. Suhang will provide equipment modifications based on their costs. Suhang will provide Buyers with high-quality after-sales services in a careful and responsible attitude, provide very strong guarantee for the Buyer's normal production.
We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email
Quotation: 
 
Delivery time: 
 
Payment: 
 
 
 
Assembly and commissioning:
 
 
Warranty: 
 
 FOB Shanghai
 
Approx 100 days after technical clearance and down payment  
 
1. first payment: 40 % by T/T
2. second payment: 60% by T/T, after the successful inspection at seller's workshop, and before delivery
 
One engineer will visit Buyer's workshop for install, commission and training, the salary of our engineer cost USD 100 per day, The customer should ensure the pre-installation being carried out appropriately, and pay round tickets, the local board and lodge.
 
12 months warranty, Starting from the date of the successful installation and commissioning of the equipments.
 
 

Minning Drilling Machine

Fully Hydraulic Jumbo Drilling Rig Underground tunneling mining drilling rig machine

1.Rugged and reliable

2.Powerful engine,low oil consumption
3. Safe,roof ROPS and FOPS approved
4. Heavy duty and verrsatile boom means direct,fast and accurate positioning
5.Feed rotation unit with 360 degrees rollover and 360 degrees rotation,could drill side doors and bolting holes
6.High performance with reliable hydraulic control system,ergonomically designed operator environment,good visibility and hand reach servicability on the panel
7.Heavy feed and rotation rock drill designed for any face condition
8. Operation friendly for easy drilling and tramming
9.Main application:
9.1.Hard rock blasting holes drilling
9.2.Tunnelling
9.3. Mining
9.4.Hydropower projects
9.5.Compact hydraulic station
9.6.The radiator for drilling machine can reduce the oil temperature efficiently to avoid hydraulic 9.7oil from changing to low viscosity or destroyed because of the very high temperature of oil.
9.8.The electric control box can protect the electric motor to operate safely.